This may be too sensitive a topic so I apologize if I***8217;m violating any norms, but how far in advance does a dealership order units for its floor plan? And how much flexibility do they have to change an order after submitting it?
 

·
Registered
Joined
·
1,765 Posts
So "floor planning," or "flooring," usually refers to the lending arrangement between the manufacturer/distributor and the individual dealers, through which dealer inventory is financed by the manufacturer or distributor. Generally, when dealers talk about their flooring, they're talking about the overhead expense of financing inventory. Holdback (AVP in BMW-speak) is, in part, designed to compensate dealers for this expense, among other things.

Each month dealers are allocated build slots through which they order/build cars for stock inventory as well as using some of these slots for Priority 1 custom builds for "sold" units destined for specific customers.

Different models have different production allocations, with some models being difficult to obtain for inventory, while other high volume models are often highly incentivised to encourage dealers to use their monthly allocated slots to order these cars.

Also, End of Production influences ordering. In most instances July is the changeover month, though some model updates occur throughout the calendar year, with the next model year cars starting production and distribution well before July, or sometimes after.
 

·
Registered
Joined
·
22 Posts
Discussion Starter #3 (Edited)
Each month dealers are allocated build slots through which they order/build cars for stock inventory as well as using some of these slots for Priority 1 custom builds for "sold" units destined for specific customers.
Thanks for educating me, '68. I assumed dealers placed orders periodically through the year, but I didn't expect it to be that frequent. I was expecting quarterly so the manufacturer would bear less financial risk, but should have considered how flexible supply chains are.
 

·
Resident Curmudgeon
Joined
·
22,113 Posts

·
Registered
Joined
·
22 Posts
Discussion Starter #5
lol

You surely have not spent enough time here!

<img src="http://s1.bimmerfest.com/forums/images/smilies/aim-angel.gif" border="0" alt="" title="Angel" class="inlineimg" />
Clearly. #Noob. (I think that***8217;s what the kids are saying these days).
 

·
///Monkeyazz Duck
Joined
·
7,545 Posts
Wait. Norm was violated?????


 

·
Registered
Joined
·
10,388 Posts
There was a student at my college who looked like Norm. Every time he'd come into the student dining hall, everybody (100+ people) would yell "Norm!."
 

·
Bimmerfest Founder
Joined
·
15,151 Posts
This may be too sensitive a topic so I apologize if I'm violating any norms, but how far in advance does a dealership order units for its floor plan? And how much flexibility do they have to change an order after submitting it?
The true answer, "It Depends".. :)

In general we order in August for September production for example. Usually we have a few weeks to tinker with/alter the specifications before it goes "firm" (no longer modifiable).
 